New solutions / 750hrs - H.p. industrial pumps preventive maintenance set
ESE con avvertenzaITA_Cover riparazioni(13)

750hrs - H.p. industrial pumps preventive maintenance set

Complete set for the preventive maintenance recommended at 750hrs

Protect your industrial pump with the preventive maintenance recommended by Idrobase Group at 750hrs.

Technical data
CODE Seal packing Valves with o-rings for caps O-rings and washers for plungers For Roccia 2.0 For Transformer Plus ZX.2306 and ZX.2306-TS Per pompa Transformer Plus ZX.2307 For Transformer Plus ZX.2308
ZX.75H01
ZX.75H02
ZX.75H03
ZX.75UD01
Technical data
Watch the video (link above) for more information
optionals / ZX.75UD01
optional idrobase
ZX.2372
optional idrobase
ZX.2372
The innovations of Idrobase to anticipate the future and give certainties to the present
bottom-banner-1400x367-novita